Lubis, M Rizky Pradista (2026) Analisis Percepatan Waktu Terhadap Biaya Pada Proyek Workshop Pks Sei Galuh Pt. Perkebunan Nusantara V. Other thesis, Universitas Islam Riau.
|
Text
skripsi_213110750_watermark.pdf - Published Version Restricted to Registered users only Download (6MB) | Request a copy |
Abstract
In the implementation of construction projects, the completion deadline is one of the essential factors that must be achieved for a project to be considered successful. The time and cost aspects of a project are closely interrelated, where changes in work duration can affect the overall project cost. This study aims to analyze the effect of time acceleration on project cost by applying the Time Cost Trade Off (TCTO) method. his study aims to analyze the acceleration of project time in relation to cost on the Workshop PKS Sei Galuh project using the Time Cost Trade Off (TCTO) method. The researcher positions the study as a project planner by utilizing field implementation data as a comparison to the planned project schedule. The project scheduling was prepared using the Precedence Diagram Method (PDM) with the assistance of Microsoft Project software to develop the network diagram and determine the critical path. The results of the study indicate that the activities included in the critical path consist of excavation work, sand fill work under the floor and foundation, concrete floor casting work, brick wall masonry work, wall plastering work, and wall finishing (skim coat) work. Based on the acceleration analysis using the Time Cost Trade Off (TCTO) method, the project duration which was originally realized in 158 working days can be accelerated to 140 working days, in accordance with the planned schedule. In terms of cost, the implementation of acceleration through the addition of labor resulted in a total project cost of Rp 1,305,857,905, which is more efficient compared to the planned cost of Rp 1,307,987,905. Therefore, the Time Cost Trade Off method can be used as an alternative in project time control to obtain an optimal project duration with more efficient costs.
| Item Type: | Thesis (Other) |
|---|---|
| Contributors: | Contribution Contributors NIDN/NIDK Thesis advisor Elizar, Elizar 1013066803 |
| Uncontrolled Keywords: | Time Cost Trade Off, Acceleration, Project, Labor Addition, Time, Cost, Critical Path. |
| Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
| Divisions: | > Teknik Sipil |
| Depositing User: | Erza Pebriani S.Pd |
| Date Deposited: | 23 Nov 2026 07:58 |
| Last Modified: | 23 Nov 2026 07:58 |
| URI: | https://repository.uir.ac.id/id/eprint/34896 |
Actions (login required)
![]() |
View Item |
