Analisis Penjadwalan Proyek Menggunakan Metode Line Of Balance Pada Proyek Pembangunan Perumahan

Saputra, Rino Pasta (2025) Analisis Penjadwalan Proyek Menggunakan Metode Line Of Balance Pada Proyek Pembangunan Perumahan. Other thesis, Universitas Islam Riau.

[thumbnail of skripsi_203110230_watermark.pdf] Text
skripsi_203110230_watermark.pdf - Submitted Version
Restricted to Registered users only

Download (4MB) | Request a copy

Abstract

The execution of construction projects requires accurate planning and scheduling to ensure that the work is completed on time. However, in practice, discrepancies often occur between the planned schedule and actual field implementation, resulting in project delays. This study aims to determine the total project duration using the Line of Balance (LoB) method and to compare its efficiency with the S-Curve method. The object of this research is the construction project of Pebatuan Cipta Residence II housing, type 36/101 m², which features repetitive work across multiple housing units. The analysis results show that the Line of Balance method produces a total project duration of 273 working days, while the S-Curve method results in 490 working days. The 217 day difference demonstrates that the LoB method is more efficient in managing repetitive construction activities. Furthermore, this method allows for a more optimal and structured division of labor, thereby improving overall project execution effectiveness.

Item Type: Thesis (Other)
Contributors:
Contribution
Contributors
NIDN/NIDK
Thesis advisor
Safitri, Safitri
UNSPECIFIED
Uncontrolled Keywords: Project scheduling, Line of Balance, S-Curve, project duration
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: > Teknik Sipil
Depositing User: Mia Darmiah
Date Deposited: 18 May 2026 08:29
Last Modified: 18 May 2026 08:29
URI: https://repository.uir.ac.id/id/eprint/33354

Actions (login required)

View Item View Item