Syandani, Septiandi (2022) Analisa Risiko Keselamatan Dan Kesehatan Kerja (k3) Proyek Pembangunan Gedung Laboraturium Center Kabupaten Kampar. Other thesis, universitas islam riau.
|
Text
153110415.pdf - Submitted Version Restricted to Registered users only Download (9MB) | Request a copy |
Abstract
The construction industry has always had a potential hazard/risk during its implementation. To reduce and prevent risks that occur, good risk management is needed. Risk management is a way to accommodate risks that may occur during the construction period. The existence of this risk management will be seen as a structured and systematic process in identifying, measuring, mapping, developing alternative risk management as well as monitoring and controlling risk management. The risk of occupational safety and health in construction is a matter of concern because it has a dominant impact when the risk occurs. The purpose of this study is to identify risks, determine dominant risks, and recommend appropriate risk controls. The method used to achieve the predetermined goals is the FMEA (Failure Mode Effects Analysis) approach. The FMEA method is a systematic technique for identifying and preventing risks before they occur. Respondents who contributed to this study were 20 respondents. The data obtained from the respondents evaluated the FMEA failure process using three indicators, namely Severity (S), Occurrence (O) and Detection (D). To determine the dominant risk value, the three indicators are multiplied and produce an RPN (Risk Priority Number). The results showed that there were 4 risk variables identified with a total of 6 risk indicators. The dominant risk obtained from the research results are 2 risk indicators, namely: (i) earth excavation work, (ii) pit foundation work and tread foundation work. Recommendations for dominant risks that can be given include: (i) access ladder, safety fence , lighting (ii) make sure the condition of the iron is not protruding or coming out, the position and the transport cable must be checked first, must be coordinated and according to SOP.
| Item Type: | Thesis (Other) |
|---|---|
| Contributors: | Contribution Contributors NIDN/NIDK Sponsor SAPITRI, SAPITRI 1012128304 |
| Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
| Divisions: | > Teknik Sipil |
| Depositing User: | Fajro Gunairo S.Ip |
| Date Deposited: | 17 Nov 2025 09:01 |
| Last Modified: | 17 Nov 2025 09:01 |
| URI: | https://repository.uir.ac.id/id/eprint/25446 |
Actions (login required)
![]() |