Analisa Pembangkit Listrik Tenaga Surya Pada Gedung C Fakultas Teknik Universitas Islam Riau

Junaidi, Muhamad (2020) Analisa Pembangkit Listrik Tenaga Surya Pada Gedung C Fakultas Teknik Universitas Islam Riau. Other thesis, Universitas Islam Riau.

[img]
Preview
Text
133310611.pdf - Submitted Version

Download (1MB) | Preview

Abstract

The solar power generation system (PLTS) is growing rapidly as fossil fuel reserves are needed for electricity generation. To meet electricity needs, the solar power generation system (PLTS) uses solar panels that can be connected to the grid. Therefore, this research uses data collection and analysis methods to determine the suitability between the total power needs of the building and the power that can be produced by PLTS. The research was conducted on the solar power plant in the c building of the engineering faculty aims to get how many additional components needed by PLTS to be able to meet the power needs of the building, and analyze the amount of energy produced by solar power plants. The number of solar modules studied was 56 pieces of type 195WP and 14 pieces of type 200 WP. Based on research and measurements carried out the total power of the building is 359802 Wh, and the maximum power that can be produced PLTS 199909.07 Watt. So the conclusion is needed to add as many as 160 pieces of panels, 240 batteries, 5 pieces of SCC.

Item Type: Thesis (Other)
Subjects: T Technology > T Technology (General)
Divisions: > Teknik Sipil
Depositing User: Mia
Date Deposited: 09 Mar 2022 10:21
Last Modified: 09 Mar 2022 10:21
URI: http://repository.uir.ac.id/id/eprint/8119