Tinjauan Terhadap Wanprestasi Atas Pemutusan Kontrak Sepihak Paket Pekerjaan Pembangunan Konstruksi Gedung Rumah Sakit Pendidikan Universitas Riau Dalam Perkara No.214/PDT.G/2016/PN.PBR (Studi Kasus)

Almughni, Surya (2021) Tinjauan Terhadap Wanprestasi Atas Pemutusan Kontrak Sepihak Paket Pekerjaan Pembangunan Konstruksi Gedung Rumah Sakit Pendidikan Universitas Riau Dalam Perkara No.214/PDT.G/2016/PN.PBR (Studi Kasus). Other thesis, Universitas Islam Riau.

[img] Text
141010366.pdf - Submitted Version

Download (1MB)

Abstract

In accordance with Article 1236-1243 of the Civil Code which states that if a debtor does not make any achievements at all or makes wrong achievements or is late in making achievements, in this case it is called that the debtor is in default. From the explanation above, we can see that the elements of the default are as follows: 1. Not doing what was promised 2. Doing what was agreed but late. 3. Doing what was promised but not as it should be. 4. Doing something according to what was promised cannot be carried out. Based on the above background, the formulation of the problems that will be answered in writing this thesis include What is the basis for the Plaintiff to file a Default Lawsuit for the Unilateral Termination of the Contract for the Construction of Building B Construction of the Riau University Teaching Hospital in Case No. 214/Pdt.G/2016/PN PBR and how is the legal settlement of the cancellation of the Construction Work Agreement for the Construction of Building B of the Riau University Teaching Hospital between PT. Mawatindo Road Construction with Riau University in Case 214/Pdt.G/2016/PN PBR. This writing when viewed from the type of research is classified into normative legal research by way of case studies, namely by studying the decision of case no. 214/Pdt.G/2016/PN.PBR. Meanwhile, if viewed from its nature, this research is descriptive analytical, which means the research is intended to provide a detailed, clear and systematic description of the main research problems. The Plaintiff's Basis for Submitting a Default Lawsuit for the Unilateral Termination of the Contract for the Construction of Building B Construction of the Riau University Teaching Hospital in Case No. 214/Pdt.G/2016/PN PBR that the cancellation of the Construction Work Agreement for the Construction of Building B of the Riau University Teaching Hospital between PT. Mawatindo Road Construction with the University of Riau which was carried out unilaterally by the University of Riau because PT. Mawatindo Road Construction was negligent in completing the work progress as specified in the work contract, however, PT. Mawatindo Road Construction to PPK and University of Riau, but the University of Riau did not listen to the advice of PPK and immediately issued a letter of termination of work with No. 118/UN 19/KU/2016, regarding the statement of Default and Termination of Contract.

Item Type: Thesis (Other)
Contributors:
ContributionContributorsNIDN/NIDK
SponsorHamzah, Rosyidi141002476
Uncontrolled Keywords: Default, Unlawful Acts, Case No. 214/Pdt.G/2016/PN.PBR.
Subjects: K Law > K Law (General)
K Law > K Law (General)
Divisions: > Ilmu Hukum
Depositing User: Febby Amelia
Date Deposited: 24 Jun 2022 15:24
Last Modified: 24 Jun 2022 15:24
URI: http://repository.uir.ac.id/id/eprint/11715