Analisis Squeeze Cementing Dengan Menggunakan Metode Balance Plug Pada Formasi Loss Di Lapangan Rc Sumur X

Ricardo, Ricci (2019) Analisis Squeeze Cementing Dengan Menggunakan Metode Balance Plug Pada Formasi Loss Di Lapangan Rc Sumur X. Other thesis, Universitas Islam Riau.

[img]
Preview
Text
133210049.pdf

Download (2MB) | Preview

Abstract

Squeeze cementing is re-cementing as one of the well-care steps, by placing the slurry cement with a relatively small volume in the desired position, one of which is to cover the perforation zone. The method of squeeze cementing used in the research is by the method of balance plug. This research was conducted on well X by collecting well data, performing data processing including calculation of cementing design, planning of cementing procedure, cementing test result by doing cement tag and compressive strength test. The result of the research shows that when the injectivity test well X has loss so it is necessary to plan the cementing of its desainya specially in loss area. The result showed that the total volume of cement must be pumped as much as 16.33 barrel with 79.73 sack of sack, after pumping and hesitation was done by WOC for 4 hours, compressive strength test was done by giving 500 psi pressure for 10 minutes. So it can be concluded squeeze cementing successfully closed the X well perforation.

Item Type: Thesis (Other)
Contributors:
ContributionContributorsNIDN/NIDK
SponsorMellysa, Richaperpustakaan@uir.ac.id
SponsorFitrianti, Fitriantiperpustakaan@uir.ac.id
Uncontrolled Keywords: Squeeze Cementing, Balance Plug, Injectivity Test
Subjects: T Technology > T Technology (General)
Divisions: > Teknik Perminyakan
Depositing User: Mohamad Habib Junaidi
Date Deposited: 19 Mar 2022 08:34
Last Modified: 19 Mar 2022 08:34
URI: http://repository.uir.ac.id/id/eprint/9229