Ghaniyyu, Rakha Athallah Al (2026) Strategi Pemilihan Komplesi Potensial Produksi Multi-Layer Pada Lapangan “R”. Other thesis, Universitas Islam Riau.
|
Text
skripsi_213210201_watermark.pdf - Published Version Restricted to Registered users only Download (2MB) | Request a copy |
Abstract
The development of new wells in multi-Layer reservoirs requires an appropriate completion strategy to optimally utilize production potential. Differences in characteristics between Layers influence flow distribution and overall well production performance. This study was conducted in the “R” Field using case studies of Wells RA-21ST and AP-21ST, which are planned to be put into production, with the objective of determining the most potential completion strategy for maximizing oil production rates. The research methodology includes Swabbing Test analysis to obtain the Productivity Index (PI), construction of Inflow Performance Relationship (IPR) and Vertical Lift Performance (VLP) curves, and nodal analysis using PIPESIM software. The analysis was performed for Single Completion and Commingle completion scenarios. The results show that under the Single Completion scenario, Well RA-21ST produces 1775.682 STB/day from Layer 1 and 2751.982 STB/day from Layer 2, while Well AP-21ST produces 1150.916 STB/day from Layer 1, 1693.046 STB/day from Layer 2, and 1214.87 STB/day from Layer 3. Under the Commingle completion scenario, Well RA-21ST achieves a total production rate of 4377.289 STB/day, while Well AP-21ST produces 1748 STB/day. Compared to the Single Completion scenario, Commingle completion provides a higher total production rate and remains within safe operating limits. Therefore, Commingle completion is concluded to be the most potential completion strategy for application in the “R” Field.
| Item Type: | Thesis (Other) |
|---|---|
| Contributors: | Contribution Contributors NIDN/NIDK Thesis advisor Musnal, Ali 0002015912 |
| Uncontrolled Keywords: | Completion Multi-Layer, sandstone, Swabbing Test, IPR, PIPE-SIM. |
| Subjects: | T Technology > T Technology (General) |
| Divisions: | > Teknik Perminyakan |
| Depositing User: | Erza Pebriani S.Pd |
| Date Deposited: | 23 Nov 2026 07:57 |
| Last Modified: | 23 Nov 2026 07:57 |
| URI: | https://repository.uir.ac.id/id/eprint/34921 |
Actions (login required)
![]() |
View Item |
