PRATAMA, MOHAMMAD YOKRI (2025) Analisis Kinerja Biaya dan Waktu dengan Menggunakan Metode Earned Value (Studi Kasus: Pembangunan Ruko West Wing Block C Bengkong Laut, Kota Batam). Other thesis, Universitas Islam Riau.
|
Text
skripsi_193110244_watermark.pdf - Published Version Restricted to Registered users only Download (7MB) | Request a copy |
Abstract
In the implementation of projects in the field, it is often found that the project execution does not align with the planned schedule and budget. Many factors contribute to delays in project completion and budget overruns. Due to these issues, effective project control is required to address execution problems, ensuring that the project can be completed within the planned time and cost. The aim of this study is to analyze the project execution in terms of cost and time by observing cost and schedule variance values, cost and schedule performance indices, as well as forecasting the completion of the project in terms of cost and time. This research uses the Earned Value Method to analyze performance in terms of cost and time. This method can identify deviations in cost and schedule variance, performance indices compared to the plan, and actual realization in the field, as well as forecast the completion of the project from both cost and time perspectives. The results of this study show that the Schedule Variance (SV) is – Rp 2,543,140,568 and the Cost Variance (CV) is – Rp 775,305,981. The project performance value in the 10th month indicates a Schedule Performance Index (SPI) of 0.86 and a Cost Performance Index (CPI) of 0.95. The estimated time to complete the remaining work (ETS) is 94 days, the estimated total duration for project completion (EAS) is 399 days, the estimated cost to complete the remaining work (ETC) is Rp 1,852,668,512, and the estimated total cost of the project (EAC) is Rp 18,784,396,925. These figures indicate that the project is experiencing delays compared to the original schedule and is also facing cost overruns beyond what was initially planned.
| Item Type: | Thesis (Other) |
|---|---|
| Contributors: | Contribution Contributors NIDN/NIDK Thesis advisor Sapitri, Sapitri 1012128304 |
| Uncontrolled Keywords: | Earned Value method, schedule variance, cost variance, schedule and cost performance index |
| Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
| Divisions: | > Teknik Sipil |
| Depositing User: | Putri Aulia Ferti |
| Date Deposited: | 23 Nov 2026 04:12 |
| Last Modified: | 23 Nov 2026 04:12 |
| URI: | https://repository.uir.ac.id/id/eprint/33604 |
Actions (login required)
![]() |
View Item |
