Sari, Putri Nilam (2023) Analisis Laju Alir Sumur Produksi Berdasarkan Uji Deliverabilitas Sumur Dengan Metode Modified Isochronal Test Pada Sumur X Lapangan Y. Other thesis, Universitas Islam Riau.
|
Text
163210261.pdf - Submitted Version Restricted to Registered users only Download (1MB) | Request a copy |
Abstract
To determine the performance of gas wells, it can be done with deliverability tests. By carrying out a deliverability test analysis, it will be known how much the productivity of a gas well is. In determining the deliverability of a gas well, a test is performed on the well (multipoint test). There are 3 multipoint test methods to get the Absolute Open Flow Potential, namely Back Pressure, Isochronal Resr, and Modified Isochronal Test. In this study, to determine the ability of producing wells, deliverability tests were used using the Modified Isochronal Test method. The purpose of this study is to analyze the flow rate of production wells of a gas reservoir. By analyzing the flow rate of production wells, it will be known the ability of these wells to flow fluid optimally. From the analysis, the slope value is 0.83 which indicates the type of flow is laminar and the coefficient of stabilized performance is 0.0002841 MMCSFD/Psi2. Then the Absolute Open Flow Potential value is 126,259 MMSCFD.
| Item Type: | Thesis (Other) |
|---|---|
| Contributors: | Contribution Contributors NIDN/NIDK Thesis advisor Fitrianti, Fitrianti 1009097501 |
| Uncontrolled Keywords: | Absolute Open Flow Potential, Deliverability, Modified isochronal test |
| Subjects: | T Technology > T Technology (General) |
| Divisions: | > Teknik Perminyakan |
| Depositing User: | Erza Pebriani S.Pd |
| Date Deposited: | 21 Nov 2025 02:41 |
| Last Modified: | 21 Nov 2025 02:41 |
| URI: | https://repository.uir.ac.id/id/eprint/31864 |
Actions (login required)
![]() |
View Item |
