Optimasi Kinerja Proyek Perumahan Dengan Menggunakan Earned Value Analysis (eva) Dan Crashing ( Studi Kasus: Perumahan Patih Pembangunan)

Dewi, Sartika Indah Permata (2023) Optimasi Kinerja Proyek Perumahan Dengan Menggunakan Earned Value Analysis (eva) Dan Crashing ( Studi Kasus: Perumahan Patih Pembangunan). Other thesis, Universitas Islam Riau.

[thumbnail of Sartika Indah Permata Dewi_11zon.pdf] Text
Sartika Indah Permata Dewi_11zon.pdf - Submitted Version
Restricted to Registered users only

Download (4MB) | Request a copy

Abstract

Increasing population and urbanization increase the demand for housing, but project implementation constraints can lead to high costs, delays, and low quality. This study aims to measure the performance of the Patih Pembangunan housing construction project by utilizing the Earned Value Management method, identify critical work in the Patih Pembangunan housing construction project, and optimize the work using the crashing method to find the optimal time and cost that can be implemented in the construction of this housing project. This research uses descriptive analysis method to process data. The Earned Value method is used to control the cost and time of the project while paying attention to its performance, while the Crashing method is used to accelerate and optimize project performance. The results show that in week 12, the performance of the Patih Pembangunan Housing project can be measured by BCWS Rp. 689,850,000, BCWP Rp. 473,995,935, and ACWP Rp. 345,089,448. Other indicators, such as SV (-) Rp. 215,854,065 and CV (+) Rp. 128,906,487, indicate time delays at a lower cost than budget. SPI (< 1) and CPI (> 1) indicate project delay with cost efficiency. In this housing project, there are 13 critical tasks out of a total of 23 tasks, which include preliminary work, land preparation, foundation, slab, columns, beams, backfilling, practical columns, wall construction, ring beams, roof construction, ceiling installation, and painting. Through crashing, the optimal time in project completion is 72 days out of 84 days with an optimal cost estimate after crashing of Rp. 511,917,000.

Item Type: Thesis (Other)
Contributors:
Contribution
Contributors
NIDN/NIDK
Sponsor
Retno, Deddy Purnomo
1005057702
Uncontrolled Keywords: Performance Optimization, Earned Value Management, Crashing, PDM, Time, Cost
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: > Teknik Sipil
Depositing User: Yolla Afrina Afrina
Date Deposited: 19 Aug 2025 01:35
Last Modified: 19 Aug 2025 01:35
URI: https://repository.uir.ac.id/id/eprint/27692

Actions (login required)

View Item View Item