Khairunnisa, Mutiara (2023) Analisis Penjadwalan Waktu Dengan Metode Pert Pada Proyek Pembangunan Konstruksi Menara Pemancar Telekomunikasioleh Pt. Putra Aditya Nugraha Di Rumbai, Pekanbaru. Other thesis, Universitas Islam Riau.
![]() |
Text
185210306..pdf - Submitted Version Restricted to Registered users only Download (2MB) | Request a copy |
Abstract
This study aims to determine and analyze the management of the implementation of telecommunication transmitter tower construction projects using the PERT method at PT. Putra Aditya Nugraha. In conducting this research, the researcher obtained the data directly from the company. In this study, researchers used the PERT method which acts as a tool to measure the timeliness of project completion and the level of probability of completion of the project. The results obtained from this study are that there are differences in project completion time when using the PERT method. By using the PERT method, project completion can be completed more quickly, namely 74 working days, with a probability of 95%. While the project completion time by PT. Putra Aditya Nugraha is 90 working days. There is a difference of 16 working days.
Item Type: | Thesis (Other) |
---|---|
Contributors: | Contribution Contributors NIDN/NIDK Sponsor Suryani, Susie 1004077001 |
Uncontrolled Keywords: | Time Scheduling, PERT Method (Program Evaluation and Review Technique) |
Subjects: | H Social Sciences > HD Industries. Land use. Labor H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management |
Divisions: | > Manajemen |
Depositing User: | Erza Pebriani S.Pd |
Date Deposited: | 07 Aug 2025 07:58 |
Last Modified: | 07 Aug 2025 07:58 |
URI: | https://repository.uir.ac.id/id/eprint/25892 |
Actions (login required)
![]() |
View Item |