Meldiana, Eva (2023) Analisis Penerapan Keselamatan Dan Kesehatan (k3) Pada Pekerjaan Struktur Atas Gedung Dengan Metode Hira, Hazid, Dan Hazop. (studi Kasus: Proyek Pembangunan Gedung Office Dso Djarum Di Jalan Soekarno-hatta, Pekanbaru). Other thesis, universitas islam riau.
|
Text
173110539.pdf - Submitted Version Restricted to Registered users only Download (22MB) | Request a copy |
Abstract
ANALYSIS OF THE APPLICATION OF OCCUPATIONAL SAFETY AND HEALTH (OSH) ON THE WORK OF THE UPPER STRUCTURE OF THE BUILDING WITH HIRA, HAZID, AND HAZOP METHODS. (Case Study: Djarum DSO Office Development Project on Soekarno Hatta Street, Pekanbaru) EVA MELDIANA 173110539 ABSTRACT The construction industry has the highest risk of work accidents in Indonesia. The number of work accidents in Indonesia during the 2017-2021 period has continued to increase. In 2017 there were 123,040 work accident cases, in 2018 there were 173,415 work accident cases, in 2019 there were 182,835 work accident cases, in 2020 there were 221,740 work accident cases, and in 2021 there were 234,270 work accident cases. The purpose of this study is to identify risk factors, determine the assessment of risk factors, and determine risk control from the assessment of risk factors in the DSO Djarum Office Development Project on Jalan Soekarno Hatta, Pekanbaru. This study uses three approaches, the first method is to determine risk identification using the HAZID (Hazard Identifications) method, the second is to determine the assessment of risk factors using the HIRA (Hazard Identifications and Risk Assessment) method, and the third is to determine the risk control of assessment of risk factors using the HAZOP (Hazard Operability) method. The results of this study showed that risk identification consisted of 5 variables and 22 risk indicators, with risk assessment namely 3 indicators at low level (low) and 19 indicators at medium level (medium). While controlling these hazard indicators consists of carrying out JSA (Job Safety Analysis), checking work locations so that they can anticipate hazards, using the Risk Control Hierarchy method, checking work equipment and maintenance (maintenance), providing Employment BPJS for workers, and giving warnings, disciplining, admonishing workers to return to focus on work and fulfill work SOP.K3, Risk, HIRA, HAZID, HAZOP
| Item Type: | Thesis (Other) |
|---|---|
| Contributors: | Contribution Contributors NIDN/NIDK Sponsor Elizar, Elizar 1013066803 |
| Uncontrolled Keywords: | K3, Risk, HIRA, HAZID, HAZOP |
| Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
| Divisions: | > Teknik Sipil |
| Depositing User: | Fajro Gunairo S.Ip |
| Date Deposited: | 17 Nov 2025 09:04 |
| Last Modified: | 17 Nov 2025 09:04 |
| URI: | https://repository.uir.ac.id/id/eprint/25508 |
Actions (login required)
![]() |
View Item |
