Ariyon, Muhammad and Rahman, Bobby and Sastraningsih, Ellyan and Mayes, Anthony (2024) The Mitigation of Risk Management: Non-Productive Time Analysis on Drilling Operations in ZY Field. JGEET (Journal of Geoscience, Engineering, Environment, and Technology), 9 (2). pp. 174-179. ISSN 2541-5794
![]() |
Text
6. The Mitigation of Risk Management Non-Productive Time Analysis on Drilling Operations.pdf - Published Version Download (633kB) |
Abstract
Currently, petroleum is still the main energy source in Indonesia. However, since the 1990s, Indonesia began to experience a decline in oil production and an increase in domestic energy demand, which caused Indonesia to import oil to meet domestic energy needs. Through SKK Migas, Indonesia has a target to produce 1 million barrels per day by 2030, with one of the efforts being undertaken by carrying out massive and aggressive drilling. Drilling is the most critical, dangerous, complex and expensive operation in the oil and gas industry. It cannot be denied that in reality many unplanned problems (unscheduled events) which result in non-productive time (NPT) are encountered during drilling operations which sometimes cause unpredictable budget usage and can also result in delays in hydrocarbon production. This research was carried out by analyzing 50 wells that had been drilled in the BR field. This research was conducted using Pareto diagrams to analyze each type of NPT which is the main root cause of problems during drilling activities. In this research, a risk management process was carried out for the NPT categories to determine the level of risk in each NPT category and develop a mitigation analysis to reduce the NPT. Dealing with the finding, it indicates that the NPT rig moving (RMV) and drilling 8-1/2 (DRLG 8-1/2) categories have a red risk level which means unacceptable. The biggest contribution to NPT in the RMV category is location problems, while for DRLG 8-1/2 it is loss of circulation. Recommendations for mitigation that can be carried out for location problems are adding sandstone/gravel for critical road access, installing matting boards at critical point areas and using soil stabilizer in the wellpad during the rainy season. Recommendations for mitigating loss circulation problems are maintaining the right mud weight, using wellbore strengthening material, controlling drilling when penetrating the loss zone.
Item Type: | Article |
---|---|
Uncontrolled Keywords: | Non-Productive Time, Oil and Gas, Drilling, Hydrocarbons, Mitigation, Risk Management |
Subjects: | T Technology > T Technology (General) |
Divisions: | > Teknik Perminyakan |
Depositing User: | Mia |
Date Deposited: | 14 Mar 2025 07:08 |
Last Modified: | 14 Mar 2025 07:08 |
URI: | http://repository.uir.ac.id/id/eprint/24459 |