Analisis Penurunan Performa Sucker Rod Pump Pada Sumur Produksi Di Lapangan Minyak Duri Heavy Oil Berdasarkan Sistem Automatic Well Testing, Tubing Pressure Survey Dan Metode Build Up Pressure Pada Wellhead

Aprizal, Riko (2022) Analisis Penurunan Performa Sucker Rod Pump Pada Sumur Produksi Di Lapangan Minyak Duri Heavy Oil Berdasarkan Sistem Automatic Well Testing, Tubing Pressure Survey Dan Metode Build Up Pressure Pada Wellhead. Other thesis, Universitas Islam Riau.

[img] Text
183210241.pdf - Submitted Version
Restricted to Repository staff only

Download (4MB) | Request a copy

Abstract

The problem that often occurs in the field of production wells using an artificial lift type beam type pumping unit with an artificial lift sucker rod pump (SRP) type is that oil wells often experience pump failure resulting in decreased production. Duri oil field heavy oil field operation Duri X has 1200 wells with a production of 19,000 BOPD. Of the 1,200 wells in the heavy oil durian oil field, there are tens or even hundreds of wells that have problems experiencing damage to the sucker rod pump. Based on the results of data from automatic well testing, tubing pressure survey, operating routine duty checklist and build-up pressure method, there are 2 wells that have experienced a decrease in production and Loss of production obtained from the results of the build up pressure analysis, namely well X and well Y. Well X has a ¼” sucker rod pump size with a production capacity of 100-200 BFPD and the last production of well X is 1.6 BOPD and after replacing the sucker rod pump with a size the same, namely ¼” production for well X rose to 61 BOPD. Then the Y well has a sucker rod pump size of ¾" with a production capacity of 100-500 BFPD and the final production for the Y well is 0.8 BOPD and after replacing the sucker rod pump with the same size, namely ¾" the production for the Y well rose to 88.0 BOPD.

Item Type: Thesis (Other)
Contributors:
ContributionContributorsNIDN/NIDK
SponsorNovrianti, NovriantiUNSPECIFIED
Uncontrolled Keywords: Artificial lift, Automatic Well Test, Build Up Pressure, Sucker Rod Pump, Rod Pump Controller
Subjects: T Technology > TN Mining engineering. Metallurgy
Divisions: > Teknik Perminyakan
Depositing User: Luthfi Pratama ST
Date Deposited: 11 Jul 2023 02:46
Last Modified: 11 Jul 2023 02:46
URI: http://repository.uir.ac.id/id/eprint/22131

Actions (login required)

View Item View Item