Analisa Penggunaan Sumber Daya Manusia Dengan Metode Resource Leveling Pada Pelaksanaan Proyek Konstruksi (Studi Kasus) Proyek Pembangunan Ruang Kelas Baru Ponpes Daarun Nahdah Thawalib Bangkinang

Retno, Deddy Purnomo and Astuti, Astuti and Tamimi, Zulfadli (2018) Analisa Penggunaan Sumber Daya Manusia Dengan Metode Resource Leveling Pada Pelaksanaan Proyek Konstruksi (Studi Kasus) Proyek Pembangunan Ruang Kelas Baru Ponpes Daarun Nahdah Thawalib Bangkinang. Jurnal Saintis, 18 (01). pp. 39-47. ISSN 1410-7783

[img] Text
Analisa Penggunaan Sumber Daya Manusia Dengan Metode.pdf - Published Version

Download (525kB)

Abstract

Labor is one of the most important human resources, because it is often limited in provision, both because of the quality factor and other things. Then the excess work force will lead to waste of costs and labor shortages will result in delays in the implementation of projects that have been scheduled. The purpose of this thesis is to determine the effective human resources in the implementation of the New Classroom Building Project Ponpes Daarun Nahdah Thawalib Bangkinang, and to find out how much cost is needed for the needs of human resource use. Resource Leveling Methods can be used to obtain an effective employment histogram in the implementation of a construction project so that there is no decrease and increased use of labor at the beginning, middle and end of the job execution schedule. The Resource Leveling process is done using Microsoft Project 2013 help. From the result of the research, it is found that the use of workforce of plan and work force after leveling is 790 people with the cost of Rp. 375,270,000.00, consisting of 470 workers at a cost of Rp. 207.270.000,00 and 320 craftsmen at a cost of Rp. 168,000,000.00. While the labor realization or field as many as 831 people with a fee of Rp. 382.011.000,00 consisting of 646 workers with a fee of Rp. 284,886,000,00 and 185 carpenters at a cost of Rp. 97.125.000,00. Thus the workforce of the plan and after smoothing is more cost effective at Rp. 6,741,000.00 compared to realization workforce.

Item Type: Article
Uncontrolled Keywords: worker, resource leveling, resources, manpower, builders.
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: > Teknik Sipil S.2
Depositing User: Mia
Date Deposited: 23 May 2023 09:26
Last Modified: 23 May 2023 09:26
URI: http://repository.uir.ac.id/id/eprint/21812

Actions (login required)

View Item View Item