Evaluasi Manajemen Waktu Pelaksanaan Proyek Menggunakan Metode CPM (Critical Path Method) Pada Pembuatan Sludge Tank CV. Kreasi Mulia Sejahtera

Wahyudin, Bayu (2020) Evaluasi Manajemen Waktu Pelaksanaan Proyek Menggunakan Metode CPM (Critical Path Method) Pada Pembuatan Sludge Tank CV. Kreasi Mulia Sejahtera. Other thesis, Universitas Islam Riau.

[img] Text
165210320.pdf - Submitted Version

Download (1MB)

Abstract

The purpose of this research is to evaluate the time management of the sludge tank project development by CV. Kreasi Mulia Sejahtera using the CPM (Critical Path Method) method. The results of this study indicate that in planning the construction of sludge tanks requires 30 working days, but what is realized in the field is 36 working days. After calculating the CPM, a more efficient time is obtained, the planning stage becomes 26 days and the realization stage becomes 30 days. There are 9 activities which are critical paths in the construction of the sludge tank project. The late arrival of material is one of the reasons why there are differences in the total workmanship of the project.

Item Type: Thesis (Other)
Contributors:
ContributionContributorsNIDN/NIDK
SponsorSuyadi, SuyadiUNSPECIFIED
SponsorNurjannah, HafidzahUNSPECIFIED
Uncontrolled Keywords: Critical Path Method (CPM), Time Management, Sludge Tank
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management
Divisions: > Manajemen
Depositing User: Mia
Date Deposited: 08 Nov 2022 09:51
Last Modified: 08 Nov 2022 09:51
URI: http://repository.uir.ac.id/id/eprint/17438

Actions (login required)

View Item View Item