Sidauruk, Jack Boy Iron (2021) Analisis Terhadap Pelaksanaan Perjanjian Kerjasama Pengawasan Teknis Jembatan Sei Wampu Antara Direktorat Jenderal Bina Marga Dengan PT. Raissa Gemilang. Other thesis, Universitas Islam Riau.
Text
161010302.pdf - Submitted Version Download (2MB) |
Abstract
The cooperation agreement made between the Directorate General of Highways and PT. Raissa Gemilang Consultant has fulfilled the conditions for the validity of an agreement as stipulated in Article 1320 of the Civil Code. For the subjective terms in the agreement, namely: each party in the cooperation agreement agrees and is capable of both the Directorate General of Highways and PT. Raissa Gemilang Consultant. The objective requirement in the agreement is clear, namely the administration of bridge supervision Based on the background of the problems described above, the authors first determine the implementation of the Sei Wampu Bridge Technical Supervision Cooperation Agreement between the Directorate General of Highways and PT. Raissa Gemilang and Obstacles or Inhibiting Factors in the Implementation of the Technical Supervision Cooperation Agreement of the Sei Wampu Bridge between the Directorate General of Highways and PT. Brilliant Raisa. This writing, when viewed from the type of research, uses observational research research methods, namely by means of surveys, in which the authors go directly to the research location to obtain the necessary data by using data collection tools in the form of interviews and questionnaires. The nature of this research is descriptive which means this research provides a clear picture. Agreement on the implementation of the technical supervision cooperation agreement for the Sei Wampu Bridge between the Directorate General of Highways and PT. Raissa Gemilang is an agreement to carry out the rights and obligations contained in the contract contract Number HK.02.01/Bb2-P2JN.S2/PKT-30/1438 dated August 28, 2019, where the Directorate General of Highways and PT. Raissa Gemilang as the service provider in carrying out the work of supervising the Sei Wampu Bridge whose implementation was carried out for 7 (seven) full months, therefore PT. Raissa Gemilang has to do his job exactly as agreed in the work contract while the obstacles in the work implementation agreement are the Technical Supervision Cooperation Agreement of the Sei Wampu Bridge between the Directorate General of Highways and PT. Raissa Gemilang that the implementation of the agreement initially went well, but there were still obstacles in its implementation because PT. Raissa Gemilang does not fulfill his achievements, as agreed, such as supervision that is not optimal, the Contractor who carries out the work is late in carrying out his work, so that the work time increases, in addition the materials used are not in accordance with KAK, plus in carrying out work on time. the rain came, so the work was not done optimally.
Item Type: | Thesis (Other) | ||||||
---|---|---|---|---|---|---|---|
Contributors: |
|
||||||
Uncontrolled Keywords: | Supervision Agreement, Sei Wampu Bridge | ||||||
Subjects: | K Law > K Law (General) K Law > K Law (General) |
||||||
Divisions: | > Ilmu Hukum | ||||||
Depositing User: | Budi Santoso S.E | ||||||
Date Deposited: | 13 Oct 2022 09:26 | ||||||
Last Modified: | 13 Oct 2022 09:26 | ||||||
URI: | http://repository.uir.ac.id/id/eprint/16251 |