Analisa Produktivitas Pekerjaan Kolom Dengan Metode Time Study Pada Proyek Pembangunan Ruang Kelas MTSN 3 Pekanbaru

Putujaya, Muhammad Charizki (2022) Analisa Produktivitas Pekerjaan Kolom Dengan Metode Time Study Pada Proyek Pembangunan Ruang Kelas MTSN 3 Pekanbaru. Other thesis, Universitas Islam Riau.

[img] Text
153110558.pdf - Submitted Version

Download (1MB)

Abstract

In the construction sector, productivity is an important factor in determining the success of a construction project to fit the planned schedule. It can be said that high productivity has a very important impact on a project. Related to this, it is very necessary to keep productivity in the field stable by increasing resources to support it, it is considered very important to know the factors that affect productivity. This final project aims to analyze the productivity of reinforced concrete structures work and find out what factors can affect the productivity of work in the MTsN 3 Pekanbaru classroom construction project. The method used in this research is to use the time study method where this method directs engineering in choosing a method related to designing a work station that is desired by both the designer and the company. The main aspect of time studies consists in the variety of procedures for determining the length of time required with a standard time measurement set for each activity that involves humans, machines or a combination of activities. The results of the productivity research at MTsN 3 Pekanbaru project indicate that the average volume of iron was obtained at 44.457 kg with an average time of 142.913 minutes. The volume of construction formwork is obtained of 3.42 m 2 with an average time of 24.412 minutes while the casting volume of 0,265 m 3 with an average time of 24.412 minutes. Factors such as the location between the material and the work site, weather factors, field conditions, experience factors, equipment availability, and relaxation allowance factors are factors that affect the productivity of reinforced column structural work.

Item Type: Thesis (Other)
Contributors:
ContributionContributorsNIDN/NIDK
SponsorSapitri, SapitriUNSPECIFIED
Uncontrolled Keywords: Time Study Method, Column, Productivity.
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: > Teknik Sipil
Depositing User: Budi Santoso S.E
Date Deposited: 24 Nov 2022 09:18
Last Modified: 24 Nov 2022 09:18
URI: http://repository.uir.ac.id/id/eprint/17835

Actions (login required)

View Item View Item