Analisis Keekonomian Kerja Ulang Pindah Lapisan Pada Sumur AD Dengan Menggunakan Kontrak Gross Split

Rumanda, Alve Dino (2022) Analisis Keekonomian Kerja Ulang Pindah Lapisan Pada Sumur AD Dengan Menggunakan Kontrak Gross Split. Other thesis, Universitas Islam Riau.

[img] Text
163210769.pdf - Submitted Version

Download (2MB)

Abstract

The problem that occurs in the AD well is that the water content (water cut) is high so that the gas production of the well. Efforts to increase gas production in the "R" field include the Rework Transfer of Layers. Layer Switching Rework is a method of switching layers by opening a new productive layer. To determine which layer is needed, it is necessary to evaluate the formation by re-interpreting the logs both qualitatively and quantitatively. To find out based on economics, what is done in this study is the calculation of the economics of gross split contracts. The data needed in this analysis are gas production data, cost data including investment costs and operating costs, as well as other supporting data. Then the calculation is carried out using economic indicators and the calculation is based on a gross split contract consisting of a base split, a variable split, and a progressive split. So that the NPV value is U$ 7,782,151, IRR 179% and POT 0,217 years.

Item Type: Thesis (Other)
Contributors:
ContributionContributorsNIDN/NIDK
SponsorAriyon, M.UNSPECIFIED
Uncontrolled Keywords: Keywords: Rework Moving Over, Economic Indicator, Gross split, sensitivity analysis
Subjects: T Technology > TN Mining engineering. Metallurgy
Divisions: > Teknik Perminyakan
Depositing User: Mohamad Habib Junaidi
Date Deposited: 22 Nov 2022 02:13
Last Modified: 22 Nov 2022 02:13
URI: http://repository.uir.ac.id/id/eprint/17717

Actions (login required)

View Item View Item